Commercial

Home/Commercial

Ikea Miami

2014-09-04T20:48:05+00:00

General Contractor: Balfour Beatty
Architect:  GreenbergFarrow
Location:  Sweetwater, FL
Owner: IKEA
Completion Date: 07/14/2014
Description: IKEA of sweetwater is the second IKEA store to open its doors in Florida. Right Way Plumbing Co. is pleased to say that we have been the subcontractor for both of the FL locations. This store consists of a 417,000 SqFt interior with a restaurant that seats up to 500 individuals. The parking lot contains 1,500 parking spaces. The store is located close to Dolphin Mall and just west of the Miami International Airport.

PAMM Miami Art Museum

2014-09-05T12:39:24+00:00

General Contractor: John Moriarty & Associates

Architect: Herzog & de Meuron

Location: Miami, FL

Completion Date: 2014

Description: Pérez Art Museum Miami is a modern and contemporary art museum dedicated to collecting and exhibiting international art of the 20th and 21st centuries. The three story building spans 200,000 square feet and houses, Verde, a waterfront restaurant and bar.

Sheltair Westside Development

2014-09-05T12:38:49+00:00

General Contractor: Turner Construction

Location: Ft. Lauderdale, FL

Owner: Holland Sheltair Aviation Group

Architect: Singer Architects

Description: Sheltair Westside Development is a 132,000 square foot hangar/office complex that includes seven bay executive jet hangars totaling 106,000 square feet. The complex has a structural steel frame and combination metal panel and tilt-up exterior wall system. The roof is standing seam metal. The project also includes 26,000 square foot of tenant office space with white box tenant fit-out.

Lexus of North Miami

2014-06-20T14:12:51+00:00

General Contractor: Stiles Construction Co.

Location: NorthMiami, FL

Architect: Winningham, Bundy & Tice Architects

Description: The 1,031,291-square-foot North Miami facility is the Lexus brand’s largest U.S. dealership in terms of total square footage. It also has the largest Lexus showroom, service and parts facility in Florida – more than 222,000 square feet. The luxury automobile dealership also boosts a fitness center with shower & lockers as well as a coffee bar & cafe. The five star service waiting areas include a full service hair salon and much more!

1111 Lincoln

2014-06-19T13:36:38+00:00

General Contractor: GT McDonald

Location: Miami Beach, FL

Architect: Herzog & de Meuron

Completion Date:

Description: The project consists of three main design components, the Pedestrian Mall, the Parking Sculpture, and the mixed Residential Commercial areas. Residential Commercial areas including a new SunTrust Bank. The Parking Sculpture or Open Air Car-park: Featuring canted concrete columns, some floors 30 feet high and technical innovations as sprinklers invisibly embedded inside the concrete decks. The Residential-Commercial areas: Include a roof top Restaurant , Spa, 50,000 square feet of retail space, a new Suntrust Bank, a handful of Residences with courtyards, a stylish Penthouse, and roof top pool. The Pedestrian Mall:  In partnership with the City of Miami Beach, will revitalize the street life and create a space where commerce mixes with culture and socializing. A mix of water gardens with local vegetation such as Mangrove, Kapok, and Cypress trees will blend with normal city life.

Himmarshee Landing

2014-06-19T13:37:49+00:00

General Contractor: Moss & Associates

Location:Fort Lauderdale, FL

Owner: Las Olas Place II

Architect: PGAL Architects

Description: This project consisted of developing 45,000 sqft of office space, 9,500 sqft or retail and restaurant space as well as a hour story garage and nine luxury townhomes. The project is located in the heart of downtown Fort Lauderdale.