Pembroke Pines Civic Center

2017-07-31T19:14:36+00:00

General Contractor: Stiles Construction
Location:  Pembroke Pines, FL
Completion Date: March 2017
Description:

The 175,000-square-foot building features lots of high ceilings, wide-open areas and a 35,000-square-foot Great Hall that will host conventions, graduations and concerts. The floor is concrete with a clear epoxy coat, and there are 3,500 retractable seats.

American Express Corporate Center

2017-07-31T19:11:00+00:00

General Contractor: Turner Construction
Location:  Sunrise, FL
Completion Date: January 2017
Description:

The American Express Corporate Center is a 400,000 square-foot operations center in Sunrise, FL. The space contains a multitude of natural lit office areas and amenities such as game rooms, a day care center, Starbucks and an 260 person on-site cafeteria.

Hollywood Circle

2018-04-10T14:18:00+00:00

General Contractor: Stiles Construction
Location:  Hollywood, FL
Completion Date: 5/1/2018
Description:

Hollywood Circle will be a 25-story mixed-use project located at 1740 Polk Street in downtown Hollywood, FL. The project has 397 residences, 104 hotel units, a 46,744-square foot Publix as well as an additional 11,379 SF of retail space.

NSU Center for Collaborative Research

2016-11-17T14:10:24+00:00

General Contractor: ANF Group
Owner: Nova Southeastern University
Location:  Davie, FL
Completion Date: 11/05/16
Description:

This 6 story 216,522 sqft building is located at the main campus of NSU in Davie, FL. The CCR will house an IBM supercomputer, one of Florida’s largest wet labs, the NSU Technology Incubator and much more. The project is pursuing a LEED Silver Certification and was built using Business Information Modeling (BIM) Practices.

City View Garage

2015-08-03T20:39:03+00:00

General Contractor: KVC CONSTRUCTORS INC
Architect: Leong Leong and Iwamoto Scott
Architect of Record: TimHaahs Engineers & Architects
Tim Haahs Project Architect: Brad Giresi, AIA, Director of Design
Location:  Miami, FL
Completion Date: 05/11/15
Description: The Design District’s newest parking area is known as the City View Garage. It houses 559 parking spaces in an architectural and artistically inspired structure.

Ikea Miami

2014-09-04T20:48:05+00:00

General Contractor: Balfour Beatty
Architect:  GreenbergFarrow
Location:  Sweetwater, FL
Owner: IKEA
Completion Date: 07/14/2014
Description: IKEA of sweetwater is the second IKEA store to open its doors in Florida. Right Way Plumbing Co. is pleased to say that we have been the subcontractor for both of the FL locations. This store consists of a 417,000 SqFt interior with a restaurant that seats up to 500 individuals. The parking lot contains 1,500 parking spaces. The store is located close to Dolphin Mall and just west of the Miami International Airport.

Sheltair Westside Development

2014-09-05T12:38:49+00:00

General Contractor: Turner Construction

Location: Ft. Lauderdale, FL

Owner: Holland Sheltair Aviation Group

Architect: Singer Architects

Description: Sheltair Westside Development is a 132,000 square foot hangar/office complex that includes seven bay executive jet hangars totaling 106,000 square feet. The complex has a structural steel frame and combination metal panel and tilt-up exterior wall system. The roof is standing seam metal. The project also includes 26,000 square foot of tenant office space with white box tenant fit-out.