PAMM Miami Art Museum

General Contractor: John Moriarty & Associates Architect: Herzog & de Meuron Location: Miami, FL Completion Date: 2014 Description: Pérez Art Museum Miami is a modern and contemporary art museum dedicated to

Read More »

Boynton Beach Town Square

General Contractor: Haskell ConstructionLocation: Boynton Beach, FLCompletion Date: 05/01/2020 Description: The Boynton Beach Town Square redevelopment project is currently underway. The town square project is a 16 acre

Read More »

Plaza San Remo

General Contractor: Moss & AssociatesLocation: Coral Gables, FLOwner: Venera Holdings, LLCArchitect: Fullerton Diaz Architects Description: This project consisted of a 500,000 SqFt mixed-use facility. The facility houses medical offices, condominiums,

Read More »

Hollywood Circle

General Contractor: Stiles ConstructionLocation:  Hollywood, FLCompletion Date: 5/1/2018Description: Hollywood Circle will be a 25-story mixed-use project located at 1740 Polk Street in downtown Hollywood, FL. The project

Read More »

American Express Corporate Center

General Contractor: Turner ConstructionLocation:  Sunrise, FLCompletion Date: January 2017Description: The American Express Corporate Center is a 400,000 square-foot operations center in Sunrise, FL. The space contains a

Read More »

Gateway Plaza of Doral

General Contractor: Miller ConstructionArchitect: Dynamica Architecture + Interior Design of MiamiLocation:  Doral, FLOwner: DBH Properties LTDCompletion Date: 05/21/15Description: A new 2-building, 84,000-square-foot retail and high-end boutique office center in Doral,

Read More »