General Contractor: KVC CONSTRUCTORS INC
Architect: Leong Leong and Iwamoto Scott
Architect of Record: TimHaahs Engineers & Architects
Tim Haahs Project Architect: Brad Giresi, AIA, Director of Design
Location:  Miami, FL
Completion Date: 05/11/15

Description: The Design District’s newest parking area is known as the City View Garage. It houses 559 parking spaces in an architectural and artistically inspired structure.

General Contractor: Stiles Construction
Location: Fort Lauderdale, FL
Completion Date: 07/01/2020

Description: Terminal 2 & 4 parking Garage at Port Everglades in Fort Lauderdale is a 6 story garage with 1,828 paring spaces and an elevated walkway.

General Contractor: ANF Group
Location: Plantation, FL
Completion Date: 10/01/2020

Description:

Baptist Health of Platantation is a 4-story, 114,000 sq.ft. medical office building located in Plantation, FL. This project consists of an Urgent Care Center, Diagnostic Center, Radiation Oncology Center, Ambulatory Surgical Center, Miami Orthopedic and Sports Medicine Institute, Physical Therapy, Primary Care Center, Medical Oncology / Infusion, and additional shell space for future expansion. In addition, the medical office building will be accompanied by a 422 space 4-story parking garage.

General Contractor: Balfour Beatty
Location: Coral Gables, FL
Architect: Fullerton-Diaz Architects, Inc.
Completion Date: 02/01/2014

Description: This 15 story mixed-use development comprises 273,000 square feet of Class A office space, including 30,000 square feet of ground-floor retail, plus an 884-space parking garage.

General Contractor: Moss & Associates
Location: Miami Beach, FL
Architect:
Completion Date: 08/01/2009

Description: Fifth & Alton is a 180,000 square foot three level vertical shopping center with a six story, 1080 parking garage.

General Contractor: Moss & Associates
Location:Fort Lauderdale, FL
Owner: Las Olas Place II
Architect: PGAL Architects

Description: This project consisted of developing 45,000 sqft of office space, 9,500 sqft or retail and restaurant space as well as a hour story garage and nine luxury townhomes. The project is located in the heart of downtown Fort Lauderdale.

General Contractor: Moss & Associates
Location: Coral Gables, FL
Owner: Venera Holdings, LLC
Architect: Fullerton Diaz Architects

Description: This project consisted of a 500,000 SqFt mixed-use facility. The facility houses medical offices, condominiums, Whole Foods supermarket. retail shops, as well as a 5 story parking garage.

General Contractor: GT McDonald

Location: Miami Beach, FL

Architect: Herzog & de Meuron

Completion Date:

Description: The project consists of three main design components, the Pedestrian Mall, the Parking Sculpture, and the mixed Residential Commercial areas. Residential Commercial areas including a new SunTrust Bank. The Parking Sculpture or Open Air Car-park: Featuring canted concrete columns, some floors 30 feet high and technical innovations as sprinklers invisibly embedded inside the concrete decks. The Residential-Commercial areas: Include a roof top Restaurant , Spa, 50,000 square feet of retail space, a new Suntrust Bank, a handful of Residences with courtyards, a stylish Penthouse, and roof top pool. The Pedestrian Mall:  In partnership with the City of Miami Beach, will revitalize the street life and create a space where commerce mixes with culture and socializing. A mix of water gardens with local vegetation such as Mangrove, Kapok, and Cypress trees will blend with normal city life.

General Contractor: Balfour Beatty
Architect:  GreenbergFarrow
Location:  Sweetwater, FL
Owner: IKEA
Completion Date: 07/14/2014
Description: IKEA of sweetwater is the second IKEA store to open its doors in Florida. Right Way Plumbing Co. is pleased to say that we have been the subcontractor for both of the FL locations. This store consists of a 417,000 SqFt interior with a restaurant that seats up to 500 individuals. The parking lot contains 1,500 parking spaces. The store is located close to Dolphin Mall and just west of the Miami International Airport.

General Contractor: Stiles Construction
Location:  Hollywood, FL
Completion Date: 5/1/2018
Description:

Hollywood Circle will be a 25-story mixed-use project located at 1740 Polk Street in downtown Hollywood, FL. The project has 397 residences, 104 hotel units, a 46,744-square foot Publix as well as an additional 11,379 SF of retail space.