(954) 423-0000 | We're available 24/7
 396 Alhambra

396 Alhambra

General Contractor: Balfour BeattyLocation: Coral Gables, FLArchitect: Fullerton-Diaz Architects, Inc.Completion Date: 02/01/2014 Description: This 15 story mixed-use development comprises 273,000 square feet of Class A office space, including 30,000 square feet of ground-floor retail, plus an 884-space parking garage.
 5th & Alton

5th & Alton

General Contractor: Moss & AssociatesLocation: Miami Beach, FLArchitect: Completion Date: 08/01/2009 Description: Fifth & Alton is a 180,000 square foot three level vertical shopping center with a six story, 1080 parking garage.
 Bass Pro Shops

Bass Pro Shops

General Contractor: Moss & AssociatesLocation: Dania Beach, FLCompletion Date: 1998 Description: This 160,000 Sq ft Bass Pro Shop is known for its large selection of hunting, fishing, and other outdoor gear. This location includes an archery/gun range along with a 30,000 gallon aquarium and…

1000 Waterford at Blue Lagoon

General Contractor: Centex-RooneyLocation: Miami, FLCompletion Date: 2009 Description: 1000 Waterford is is a class A office building located near the Miami International Airport. The building contains 247,000 net rentable square feet and is a LEED Gold certified project.
 Publix (Various Locations)

Publix (Various Locations)

Description: Right Way Plumbing Co. has collaborated with various general contractors in the South Florida area to construct 14 Publix locations in South Florida. List of Locations: Publix 0127 – Oak Construction Publix North Miami Beach – Keene Construction Publix 0308…