General Contractor: Stiles Construction
Location:  Hollywood, FL
Completion Date: 5/1/2018
Description:

Hollywood Circle will be a 25-story mixed-use project located at 1740 Polk Street in downtown Hollywood, FL. The project has 397 residences, 104 hotel units, a 46,744-square foot Publix as well as an additional 11,379 SF of retail space.

General Contractor: Layton Construction Company
Location:  Miami Beach, FL
Completion Date: March 2017
Description:

 This 153,000 sq ft project is an arts center, performance hall, retail center and parking structure located in the heart of the Faena district.

General Contractor: Turner Construction
Location:  Sunrise, FL
Completion Date: January 2017
Description:

The American Express Corporate Center is a 400,000 square-foot operations center in Sunrise, FL. The space contains a multitude of natural lit office areas and amenities such as game rooms, a day care center, Starbucks and an 260 person on-site cafeteria.

General Contractor: Stiles Construction
Location:  Pembroke Pines, FL
Completion Date: March 2017
Description:

The 175,000-square-foot building features lots of high ceilings, wide-open areas and a 35,000-square-foot Great Hall that will host conventions, graduations and concerts. The floor is concrete with a clear epoxy coat, and there are 3,500 retractable seats.

General Contractor: Turner Construction
Location: Miami, FL
Completion Date: 4/1/2018
Description:

The Telemundo Center project is a $250,000 million headquarters located off of Northwest 25th street and 117th place. The project is a 3-story, 476,000 square foot, office building comprised of work stations, open spaces and high-tech production stages.

General Contractor: Moss Construction
Architect: Bermello-Ajamil & Partners
Location: Fort Lauderdale, FL
Completion Date: 10/01/2018

Description:

The Port Everglades Terminal 25 project consist of a 2-story cruise ship terminal renovation and a passenger loading bridge and ground transportation area expansion.

General Contractor: Haskell Construction
Location: Boynton Beach, FL
Completion Date: 05/01/2020

Description:

The Boynton Beach Town Square redevelopment project is currently underway. The town square project is a 16 acre site that will include renovating the Boynton Beach High School into a culture center, residential and retail spaces. There will be a hotel, playgrounds, amphitheaters, open spaces, parking garages, a fire station, utility chiller plant and a new City Hall/Library.

General Contractor: Stiles Construction
Location: Fort Lauderdale, FL
Completion Date: 03/01/2021

Description:

The Main Las Olas is a 1.4 million-square-foot, mixed-use office, residential and retail community featuring stunning high-end architecture, Class A offices, chic residences and destinations for gathering, dining and shopping.

General Contractor: Stiles Construction

Location: Doral, FL

General Contractor: Hodgens Construction

Location: Davie, FL